Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report - U.s. Nuclear Regulatory Commission - Books - CreateSpace Independent Publishing Platf - 9781500611279 - July 22, 2014
In case cover and title do not match, the title is correct

Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report

U.s. Nuclear Regulatory Commission

Price
S$ 33
excl. VAT

Ordered from remote warehouse

Expected delivery Nov 7 - 20
Add to your iMusic wish list

Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report

The purpose of this NUREG is to establish the feasibility of developing a risk-informed and performance-based regulatory structure for the licensing of future nuclear power plants (NPPs). As such, this NUREG documents a ?Framework? that provides an approach, scope and criteria that could be used to develop a set of requirements that would serve as an alternative to 10 CFR 50 for licensing future NPPs; however, this Framework is not the entire process. It is an initial phase in is to demonstrate the feasibility of such a concept, recognizing that for full implementation there will be outstanding programmatic, policy, and technical issues to be resolved. As such, this feasibility study does not represent a staff position, but rather a significant piece of research. The second phase, which involves implementation, is comprised of several, iterative steps: resolution of issues, development of draft requirements and regulations, pilots and tests, and rulemaking.

Media Books     Paperback Book   (Book with soft cover and glued back)
Released July 22, 2014
ISBN13 9781500611279
Publishers CreateSpace Independent Publishing Platf
Pages 182
Dimensions 216 × 279 × 10 mm   ·   435 g
Language English  

Show all

More by U.s. Nuclear Regulatory Commission